Service hotline: shenzhen:0755-25857507 Hunan:0731-55880108

業(yè)務(wù)領(lǐng)域

聯(lián)系我們

深圳粵鵬環(huán)保技術(shù)股份有限公司
電話:0755-25857566
郵箱:sales@yphb.com.cn
地址:深圳市羅湖區(qū)寶安南路深港豪苑名商閣 20C/D/E
湖南景翌湘臺環(huán)保高新技術(shù)開發(fā)有限公司
電話:0731-55880108
郵箱:sales@yphb.com.cn
地址:湘潭市九華經(jīng)濟技術(shù)開發(fā)區(qū)東風路8號
Product Details
當前位置: Home> Product Details

Complete equipment device for blasting line wastewater treatment, complete equipment device for blas

  • Complete equipment device for blasting line wastewater treatment, complete equipment device for blas
Complete equipment device for blasting line wastewater treatment, complete equipment device for blas
  • Project Introduction

Complete equipment device for blasting line wastewater treatment

Patent No.: ZL201620247102.8

Application date: 2016.03.29

Announcement (announcement) date: 2016.08.24


Main technical features:

ü Equipment includes first-stage reaction tank, primary stirring device, primary pH measuring equipment, primary dosing device, water distributor, secondary reaction tank, secondary stirring device, secondary pH measuring equipment, secondary dosing Device, sedimentation tank, sedimentation tank baffle, inclined plate packing, sedimentation tank mud bucket, pH returning tank, returning tank stirring device, three-stage pH measuring equipment and returning tank dosing device, the first stage of the first-stage reaction tank is provided with two stages In the reaction tank, a sedimentation tank is arranged on the right side of the secondary reaction tank, and a pH adjustment tank is arranged on the right side of the sedimentation tank, and a first-stage stirring device is arranged in the first-stage reaction tank, and the lower end of the first-stage pH measuring device is extended into the first-stage reaction tank, The first stage of the reaction tank is provided with a first-stage dosing device, a water distributor is arranged between the first-stage reaction tank and the second-stage reaction tank, a secondary stirring device is arranged in the second-stage reaction tank, and the lower end of the secondary pH measuring device is extended into the second-stage reaction. Inside the pool, a secondary dosing device is arranged in the upper part of the secondary reaction tank, and a sedimentation tank baffle is arranged inside the sedimentation tank. The upper end of the sedimentation tank baffle is provided with a sloping plate packing, and the lower part of the inclined plate packing is provided with a sedimentation tank mud bucket. , pH callback The pool is equipped with a returning tank stirring device. The lower end of the three-stage pH measuring device is inserted into the pH recovery tank. The upper part of the pH adjusting tank is provided with a returning tank dosing device, a primary pH measuring device, a secondary pH measuring device, and a three-stage pH measuring device. Equipment, primary dosing device, secondary dosing device, callback cell dosing device and PLC control system are electrically connected


ü The process is simple, the degree of automation is high, and the operation and maintenance are simple. While ensuring the qualified water, there is no need to add PAC, PAM and other chemicals, no need to use reverse osmosis membrane, and reduce operating costs.


ü The processing device has few mechanical equipments, convenient management and long-term stable operation. It consists of two reaction tanks, one sedimentation tank and one PH recovery tank. It has compact structure, simple process, small floor space, convenient expansion and expansion, and suspension in wastewater. Things can be fully removed

Previous
Next