Service hotline: shenzhen:0755-25857507 Hunan:0731-55880108

業(yè)務(wù)領(lǐng)域

聯(lián)系我們

深圳粵鵬環(huán)保技術(shù)股份有限公司
電話:0755-25857566
郵箱:sales@yphb.com.cn
地址:深圳市羅湖區(qū)寶安南路深港豪苑名商閣 20C/D/E
湖南景翌湘臺環(huán)保高新技術(shù)開發(fā)有限公司
電話:0731-55880108
郵箱:sales@yphb.com.cn
地址:湘潭市九華經(jīng)濟技術(shù)開發(fā)區(qū)東風(fēng)路8號
Product Details
當前位置: Home> Product Details

Secondary copper removal process for treating low concentration integrated wastewater in PCB electro

  • Secondary copper removal process for treating low concentration integrated wastewater in PCB electro
Secondary copper removal process for treating low concentration integrated wastewater in PCB electro
  • Project Introduction

Secondary copper removal process for treating low concentration integrated wastewater in PCB electroplating

Patent No.: ZL201510321718.5

Application date: 2015.06.12

Announcement (announcement) date: 2015.09.30


Main technical features:

ü The treatment process includes a secondary copper removal process: the first stage removes copper from the hydrated copper ions in the wastewater, and the second stage removes the copper ions from the second stage.


ü After the wastewater is upgraded, enter the pH adjustment tank, add the alkaline agent by pumping to control the pH to 8.5~9, enter the fast mixing tank and slow mixing tank, and the clear water after the first stage sedimentation is pumped into the broken pool, plus The appropriate amount of ferrous sulfate is broken, and the pH of the wastewater is adjusted to 8 ~ 9, too fast mixing tank, slow mixing tank, secondary sedimentation wastewater enters the pH recovery tank for biochemical treatment, up to standard discharge

ü Conducive to eliminating the impact of fluctuations in the drainage of the workshop on the stability of wastewater treatment, and increasing the means of regulating wastewater

ü Save the cost of chemical treatment, reduce the amount of system sludge, and increase the copper content of sludge, which is conducive to resource recovery, stable drainage water quality, and reduced wastewater treatment cost. It has significant promotion value in wastewater treatment of existing PCB industry.


ü Process:

First level: integrated wastewater → pH adjustment tank → fast mixing tank → slow mixing tank → primary sedimentation tank

Second stage: first stage sedimentation tank→breaking pool→pH adjustment tank→fast mixing tank→slow mixing tank→secondary sedimentation tank→pH recovery tank→biochemical treatment/emission

Previous
Next